MODULE 1: FOUNDATIONS OF PROJECT MANAGEMENT
MODULE 2: PROJECT INITIATION AND DESIGN
MODULE 3: PROJECT PLANNING
MODULE 4: FUNDRAISING FOR DEVELOPMENT PROJECTS
MODULE 5: PROJECT IMPLEMENTATION
MODULE 6: PROJECT CLOSURE

Module 1 Assignment: Instructor-Marked

Case Study: Healthcare Project in Low-Income Districts

Background:

You are a project manager working for an international aid organization. Your organization is implementing a healthcare project in low-income districts with limited access to medical services. This project aims to provide essential healthcare infrastructure and services to improve the well-being of the local population.

Part 1: Define the relevant scope, schedule, and cost parameters for this project.

Part 2: Analyze how changes in one constraint (scope, schedule, or cost) may influence the other two constraints in this healthcare project. Provide practical examples to illustrate these interactions.

Areas of Evaluation & Grading

Level of Knowledge and UnderstandingCreativity and OriginalityStructure of Assignment/ReportClarity of ExpressionAdherence to Instructions
Depth and accuracy of the content, demonstrating an understanding of the subject matter, use of relevant examples, and ability to integrate multiple perspectives.The level of creativity, innovation, and original thought demonstrated in the assignment (submissions will be checked for plagiarism and AI-generated
content).
The overall organization and structure of the assignment, including the introduction, body, and conclusions reached.The clarity and effectiveness of writing or communication, including grammar, spelling, and coherence.Assessment as to whether the assignment meets all specified instructions, such as word count, format, and submission requirements.
Scroll to Top